top of page
Te Aroha - Economy.png

TE AROHA STUDIO - OPTION C

ECONOMY RANGE

2

2

1

FLOOR AREA

51.84m2 approx.

​

DIMENSIONS

14.4m x 3.6m

Plans are indicative only. Please consult with Taonga Developments for further information.

Te Aroha C.png
SPECIFICATIONS
  • Built to NZS:3604 under supervision of a Registered Master Builder and Licensed Building Practitioner

​

  • All electrical work carried out by a registered Master Electrician​

 

  • Superior Insulation in all exterior walls and ceiling and under floor.

​

  • Premium double glazed aluminium joinery windows and ranch slider, all powder coated.​

​​

  • Colour Steel roofing, gutter and down pipe.

​

  • New Zealand made timber weatherboard cladding.

​​

  • Standard Gas Califont which attaches to two 45kg gas bottles (gas bottle not included).

  • 90mm Steel Structure framing.

 

  • High quality Strand flooring base.

 

  • RCD power protection and main 15-meter power lead (caravan lead with interface box connection) supplied.

 

  • Ample light fittings and power points throughout.​​​

​​

  • High quality kitchen units with Formica bench top.

  • ​

  • Fisher and Paykel appliances
    ​

  • Full-size 1m x 1m shower cubicle with glass full width door.

​​

  • Towel rail and toilet roll holder.

​​

  • Full flush toilet.

EXCLUSIONS
  • Window treatments (curtains or blinds).

​

  • Transport to site.

​

  • Decks, steps, base cladding or handrails (if required).

 

  • Onsite services (power, water, storm water & sewerage onsite hook up).

​

  • Under floor waste and installation of downpipes by drainage contractor.

​

  • Onsite building consent.

​​

  • Engineering.

​

  • Quality vinyl planking throughout with the option of carpet.

​​

  • Fujitsu Inverter heat pump.

  • Site preparation.

​

  • Surveying - boundary & building position pegs required on all sites (responsibility of owner).

 

  • Resource consent or council contributions. 

 

  • Consent notice requirements listed on the certificate of title.

 

  • Watercare application or fees.

 

  • WEL Connection fee.

 

  • Vehicle crossing.

bottom of page